Portable Rig for Geological Survey

The LE90R portable rig for geological survey drills at any angle from vertical, with a 360 degree swivel head, 92 mm spindle bore, 500 mm feed stroke and three spindle speeds on a 1,300 kg skid for inclined holes through dipping strata.

Rated 4.7/5 based on 366 customer reviews
Share:
  Content   2026-11-26

Portable Rig for Geological Survey

In a geological survey the borehole is a measuring instrument rather than a sampling exercise. What leaves the hole is not grade but geometry: which unit sits above which, where the contact falls, how steeply the beds dip and how thick they really are. That changes what matters in a portable rig for geological survey, because a machine that produces beautiful core at the wrong angle produces data that has to be corrected before anyone can use it.

geological mapping drill rig
geological mapping drill rig

What a survey hole has to establish

Four things, in order. The sequence of units penetrated. The depth of each contact below the collar. The dip and dip direction of the beds, where they can be read. And the true thickness of each unit, which is the number the map actually needs.

Only the first two come free with a vertical hole. The other two depend on how the hole is oriented, which is a decision made at the rig.

True thickness is a trigonometry problem

Apparent thickness is what a vertical hole measures. True thickness is what the map needs, and the two are related by the angle between the hole and the normal to the bedding.

Where a hole crosses bedding at 60°, a ten metre apparent interval becomes about five metres of true thickness, because ten multiplied by the cosine of sixty degrees is five. Drill the same bed at 30° to the normal and the same bed reads 8.7 m. Nothing about the rock has changed; only the angle of the hole has.

That is why the drilling angle on this machine is a survey specification rather than a convenience. Our LE90R carries a swivelling head quoted at a 360° drilling angle, which allows a hole to be aimed across the strike at the angle that gives the most usable geometry for the dip being mapped.

Aiming the hole, and holding the aim

Two practical points follow. The first is planning: decide the angle from the expected dip, not from what the last hole used. The second is holding it, because an inclined hole loads the string differently from a vertical one, and the string wants to slide back between runs. The planetary hoist with its brake and clutch bands and 1,500 kgf of upward thrust are what hold the rods while a connection is made.

A small error at the collar becomes a large one at depth. One degree off over thirty metres puts the bottom half a metre away from where the section expects it, and the section is drawn from the collar, not from the truth.

A hole without orientation is a point without a direction

Six entries make a survey hole usable: collar coordinates, collar elevation, hole azimuth, hole inclination, the depth of every contact, and recovery per interval. Miss any one and the hole cannot be placed in a three dimensional model.

Collar elevation is the one most often taken for granted. A survey that is being compiled against a topographic base needs the collar height to the same accuracy as the map, and a driller’s guess at ground level is not that. Have the collar surveyed, and write the datum on the log.

Where this rig is over-specified

Honesty is cheaper than a wrong sale. A programme of three metre survey holes at close spacing needs a smaller machine. The mast stands 5.75 m and has to be raised and lowered at every position, and the 500 mm feed stroke means six re-chucks for three metres of hole. At that scale the rigging time per hole exceeds the drilling time.

A portable rig for geological survey earns its cost when holes reach twenty to forty metres, when the ground needs casing, or when the section has to be carried through into rock. Below that, a lighter machine with a shorter mast will usually finish the same mapping job faster.

Getting between positions

Survey holes often follow an outcrop or a structure rather than a regular grid, which means irregular moves over ground that was never prepared. The 1,140 mm wide skid with three drag pulleys allows a portable rig for geological survey to be pulled between positions by a light vehicle, and the 1,300 kg mass decides whether a quad, a pickup or a winch does the pulling.

Recording what the next person needs

Log the interval, not just the total. A hole reported as thirty metres through sandstone tells the compiler nothing; a hole reported as four intervals with depths, contacts and recovery tells them where to draw the line.

Photograph the core box with a scale and the run numbers visible. Where structural measurements are taken, record whether the core was oriented, because an unoriented fracture measurement is a trend without a direction.

What to send with an enquiry

The stratigraphic question the survey is trying to answer, the expected dip and dip direction, the hole angles you plan to use, the depth range, the positions and how they will be set out, whether collar elevations will be surveyed, and what recovery the interpretation needs. Send these to sales1@leadcrete.com.